Sie sind hier: Startseite » CityRiver » Project Area
Donauspitz Measures: Bank flattening, near-natural bank design and staircase installation, gravel groynes, and bed load augmentation.
Old Danube Port / Historic Quay Wall Measures: Near-natural staircase installation, boat landing stage, boat channel, gravel groynes, V-ramp, armored bed (armoring), bed stabilization measures, aquatic structure, and gravel spawning grounds.
Wildnis (Wilderness) Existing condition: Steep embankments and virtually no riverside path. Measures: Bank flattening, bed load, armored bed, bed stabilization measures, and floodplain structure.
In the foreword of the German Rowing Association’s (DRV) Waterbody Catalog, the passage in Donauwörth is described as follows:
„An onshore reconnaissance to assess the bridge passages and the overall transit through Donauwörth is advisable due to changing water levels and current conditions. Since 2019, planning has been underway for flood protection within the urban area. Additionally, a safe navigation channel near the Danube bridge extending to the so-called ‚Old Danube Port‘ is to be established, along with docking, undocking, and launching facilities for pleasure craft on the left bank in this section.“
The exact description can be found in the Danube Waterbody Catalog here:
Dann kontaktieren Sie uns einfach jederzeit unter folgenden Kontaktmöglichkeiten:
Sie sehen gerade einen Platzhalterinhalt von Vimeo. Um auf den eigentlichen Inhalt zuzugreifen, klicken Sie auf die Schaltfläche unten. Bitte beachten Sie, dass dabei Daten an Drittanbieter weitergegeben werden.
Mehr Informationen